
AUTOMATIC BATTERY OPERATED GREASE TRAP ENZYME DISPENSER

Our dispenser comes with tubes and other accessories to get you started right away without having to buy anything extra.
What you need to install this dispenser?
- A drill with a 1/4 inch drill bit for cutting hole in the drain line (to insert 1/4 inch injection tubing, which is provided with the dispenser).
Easy Installation Steps:
- Mount the dispenser on the wall using the screws provided. You will need the drill to make holes for the screws to fit in.
- Take one of the two tubes provided and hook up one end on the dispenser side and other side goes in the "Trapeze" bucket. Take the other tube and hook one end on the dispenser side (look at the diagram above).
- Now, using the drill and 1/4 inch sized drill bit, drill a hole into the drain line (the one through which water goes in the grease trap). After the hole is drilled, insert the lose end of the tube into the hole that you just drilled. The tube fits exactly the hole drilled, so you do not need to worry about leaks.
- After this is done, all you need to do is set up your timing using the instructions provided with dispenser.
The dispenser comes with full detalied intructions on how to install the device, how to use it and how to troubleshoot it. If you find difficulty in installing, you can always contact us via email at support@soapman.com or by phone at 1 800 MIX SOAP
|
|
|
|
Call 1 800 MIX SOAP to order by phone between 9am and 5pm EST
SoapMan, and contents of http://www.soapman.com are copyright 2000, 2001 Soapman.com Inc. Contact Webmaster